Guide

NICEIC vs NAPIT: Which Scheme Should an Electrician Join?

NICEIC vs NAPIT, with STROMA and BSI: assessment, Domestic Installer vs Approved Contractor, and what assessors check on certificates. Pick the right scheme.

Published 14 September 2026 · Updated 14 September 2026 · Certio Software Ltd

NICEIC and NAPIT are the two largest competent-person schemes for electricians in England and Wales. Both are authorised by the government to run Part P self-certification under the Building Regulations, both are recognised by TrustMark, and both assess members annually against BS 7671. NICEIC is operated by Certsure LLP (which also runs the ELECSA brand) and is the older, better-known name with homeowners and commercial clients; NAPIT is a trade association and scheme operator that covers electrical alongside other building services trades. STROMA and BSI also operate authorised electrical schemes. There is no legal difference in what a registered electrician can do; the choice comes down to the work you do, the registration level you need and how each scheme's assessment and support suits you.

Key takeaways
  • NICEIC, NAPIT, STROMA and BSI are all government-authorised for Part P; none is legally superior.
  • NICEIC Approved Contractor covers commercial and industrial work; Domestic Installer covers dwellings only.
  • Assessment is annual and always includes a review of your certificates and a visit to recent jobs.
  • Assessors check certificates for completeness, correct form, real test results and correct coding.
  • Costs are an annual registration plus a per-job notification charge; check current figures with the schemes.

What is a competent-person scheme?

A competent-person scheme is a government-authorised body that assesses tradespeople as competent to self-certify that their work complies with the Building Regulations; for electrical work in England and Wales, that means Part P. A registered electrician notifies notifiable jobs to the scheme, which issues the compliance certificate and informs the local authority. Without registration, notifiable work goes through building control, with a fee and an inspection. See Part P notification explained.

Registration is not a licence to practise; there is no legal licensing of electricians in England and Wales. It lets you self-certify Part P work, lists you on the Registered Competent Person Electrical register, and gives customers and main contractors a third-party check on your competence.

Which schemes are there?

Scheme Operator Notes
NICEIC Certsure LLP (owned by the Electrical Safety Council and the ECA) Largest and best-known; Domestic Installer and Approved Contractor registrations; also runs the ELECSA brand, which merged into Certsure
NAPIT NAPIT Registration Ltd, part of the NAPIT Group Electrical plus plumbing, heating, ventilation, renewables and other trades under one registration; strong with sole traders and multi-trade firms
STROMA Stroma Certification Electrical scheme alongside energy assessment and other building certification; smaller and often chosen for price or speed
BSI British Standards Institution Kitemark-branded electrical installer scheme; smaller in the domestic market, recognised name in commercial

ELECSA was a separate scheme that became part of Certsure; its members were brought under the NICEIC umbrella and new registrations go to NICEIC.

How do NICEIC and NAPIT compare?

NICEIC NAPIT
Part P authorised Yes Yes
TrustMark recognised Yes Yes
Registration levels Domestic Installer; Approved Contractor Domestic (Part P) registration; full-scope registration for commercial and industrial
Other trades Electrical focus (plus some related schemes) Electrical, plumbing, heating, ventilation, renewables, EV, and more
Brand recognition with customers Highest in the sector Good, growing; strong TrustMark link
Assessment Annual, office and site Annual, office and site
Technical helpline and publications Yes Yes
Certificate stationery and software Own certificates and online certification Own certificates and online certification; third-party software accepted
Cost Annual registration fee plus per-notification charge; varies by registration level Annual registration fee plus per-notification charge; generally positioned as the more economical option

Both schemes accept certificates produced by third-party software as long as the forms follow the BS 7671 model in Appendix 6. Neither obliges you to use its own pads or online system. Both charge an annual registration fee (varying by level and size of business) plus a small per-notification charge, with an application and assessment fee on entry; the schemes publish current figures and they change annually, so check the schemes' own pages.

Where NICEIC tends to suit

Contractors doing commercial and industrial work where a client or main contractor specifies "NICEIC Approved Contractor" in the tender, and firms that want the strongest consumer brand on the van.

Where NAPIT tends to suit

Sole traders and small domestic firms who want a scheme used to dealing with one-person businesses, and multi-trade companies who can register electrical, heating, ventilation and renewables under one roof.

Beware of forum anecdote on this. Assessment experience depends far more on the individual assessor and on how well prepared you are than on which logo is on the letterhead.

What is the difference between Domestic Installer and Approved Contractor?

NICEIC's two main electrical registrations are aimed at different businesses.

Domestic Installer (DI) is the Part P registration. It covers electrical work in dwellings and their outbuildings and gardens, and lets you self-certify notifiable domestic work. Requirements centre on the current BS 7671 qualification (City & Guilds 2382 or equivalent), an inspection and testing qualification (2391 or equivalent) and demonstrated competence on site.

Approved Contractor (AC) covers commercial, industrial and domestic work. The business nominates a Qualified Supervisor holding a Level 3 electrical qualification (or equivalent experience) plus the BS 7671 and inspection and testing qualifications, who takes responsibility for the technical standard of all the firm's work. It is what larger clients, housing associations and main contractors usually ask for.

NAPIT, STROMA and BSI are similar in effect, with a domestic Part P registration and a wider registration for commercial and industrial work. Most sole traders start at domestic level and move up once they have a qualified supervisor and commercial work to show an assessor.

What does the assessment process involve?

Every scheme assesses on entry and then annually; the shape is the same.

Before the visit

You submit qualifications, proof of public liability insurance at the level the scheme requires, instrument calibration certificates and details of recent jobs. The scheme allocates an assessor and a date.

At the office

The assessor checks:

  • Qualifications of the Qualified Supervisor or principal duty holder.
  • Insurance certificate and expiry.
  • Test instruments: calibration certificate in date and a check on a known reference (many assessors ask you to test the calibration checkbox in front of them).
  • Reference library: the current BS 7671 (A4:2026 from 15 October 2026, when A2:2022 is withdrawn; see Amendment 4: what changes), the On-Site Guide and Guidance Note 3.
  • Certificates: a sample of EICs, Minor Works Certificates and EICRs you have issued since the last visit, checked in detail (see below).
  • Notification records matching the certificates, and any complaints.

On site

The assessor visits one or more recent jobs, usually chosen from your certificates, and inspects the work against BS 7671: the consumer unit or distribution board, earthing and bonding (Chapter 54), RCD provision (Regulations 411.3.3 and 411.3.4), cable installation and labelling, with spot tests to compare against the values on your certificate. A Zs you recorded as 0.35 Ω measuring 1.2 Ω on the day means you either did not test or wrote it down wrongly.

Outcome

Non-conformances must be closed out within a set period, sometimes with a re-visit. Persistent or serious failings lead to suspension or removal from the register.

What do assessors check on certificates?

This is where most assessment problems occur, and it is entirely within your control.

Check What the assessor wants to see
Correct form for the work EIC for new circuits and consumer unit changes, Minor Works Certificate for single-circuit alterations, EICR for periodic inspection; never a Minor Works Certificate for a board change
BS 7671 edition The edition stated matches the date and the work
Client and installation details Complete, including the extent of the work and any limitations
Supply characteristics Earthing system (TN-C-S, TN-S, TT), Ze, prospective fault current, nominal voltage recorded, not left blank
Earthing and bonding Main earthing conductor and main protective bonding sizes and confirmed present; not "N/A" in a dwelling with gas and water
Schedule of inspections Attached to every EIC and EICR, every item ticked, N/A or LIM with a reason
Schedule of test results Every circuit with a measured value in every applicable column: R1+R2 (or r1, rn, r2 for rings), insulation resistance, polarity, Zs, RCD time
RCD results Recorded wherever an RCD protects the circuit, at IΔn; a blank RCD column on a socket circuit is a typical non-conformance
Maximum Zs comparison Recorded Zs is within the maximum for the device, with the 80% rule of thumb or temperature correction applied
EICR observations Each observation with a location, a description, a code (C1, C2, C3 or FI) and a regulation reference; overall assessment consistent with the codes (any C1, C2 or FI is unsatisfactory)
Signatures and dates Signed by the right person at the right level (Qualified Supervisor where required), dated, with the next inspection recommendation
Consistency with notification The job notified matches the certificate: address, date, description

Two habits fix most of it: never issue a certificate with an empty box that should have a value, and keep every certificate in one place with the job record and notification reference so you can produce a sample for the assessor in a minute. For more on coding, see EICR codes explained.

How Certio helps

Certio produces the EICR, EIC, Minor Works certificate and PAT records on the BS 7671 model forms and turns them into branded PDFs. Photograph the consumer unit and the circuit schedule drafts itself; point the phone camera at a Megger MFT-X1 and the reading goes straight into the schedule of test results, or dictate it while your hands stay on the probes. Suggested observation wording with the regulation reference is there for you to check and confirm. The judgement stays yours; the typing goes. Starter is free for 7 days, then £5 a month.

Straight answers

Questions

Is NICEIC better than NAPIT?
Neither is better in law. Both are government-authorised competent-person schemes for Part P in England and Wales and both are recognised by TrustMark. NICEIC has the stronger brand recognition with homeowners and commercial clients; NAPIT is often seen as more accessible for sole traders and covers other trades under one registration. Choose on the work you do and the support you want.
What is the difference between an NICEIC Domestic Installer and an Approved Contractor?
Domestic Installer registration covers electrical work in dwellings and is the route for Part P self-certification. Approved Contractor is the wider registration covering commercial and industrial work as well as domestic, with more demanding requirements for the Qualified Supervisor, and is what larger clients and main contractors usually specify.
What happens at a competent-person scheme assessment?
An assessor visits your office, checks qualifications, insurance, test instrument calibration and your reference library, reviews a sample of certificates you have issued, and visits one or more recent jobs to inspect and test the work against BS 7671. Any non-conformances must be closed out, and the assessment is repeated annually.
What qualifications do I need to join NICEIC or NAPIT?
For domestic installer registration you typically need a current BS 7671 qualification (18th Edition), an inspection and testing qualification, and evidence of practical competence. Approved Contractor and full-scope registrations expect a Level 3 electrical qualification or equivalent experience for the Qualified Supervisor. Requirements are set by the schemes and change, so check the current criteria.
Can I be registered with more than one scheme?
Yes, but there is rarely a reason to. Each registration carries its own annual fee and assessment. Some contractors hold a domestic registration with one scheme and a commercial registration with another for historical reasons, but a single Approved Contractor or full-scope registration covers both types of work.
What do assessors check on certificates?
That every certificate is complete: the correct form for the work, the BS 7671 edition stated, supply characteristics, earthing and bonding confirmed, every test result recorded with real measured values, RCD results where required, the schedule of inspections attached to EICs and EICRs, observations coded correctly, and that the certificate matches the job you notified to the scheme.
Less typing, same judgement

Down tools at 5. The paperwork's already done.

Certio lays out EICR, EIC, Minor Works and PAT certificates to the BS 7671 model forms and produces branded PDFs. Photograph the board and the schedule drafts itself; point the camera at a Megger MFT-X1 and the reading goes straight in. Starter is free for 7 days, then £5 a month. Pro is £10 a month with unlimited certificates.

Try Starter free for 7 days →

More on EICR software and AI EICR software. Prices exclude VAT.