Guides

Guides for UK electricians

Straight answers on the paperwork side of the job, written in plain English with the sources linked.

BS 7671 Amendment 4: what changed on your certificates

The key dates, the EICR, EIC and Minor Works form changes, the new FI rule, and what to do before 15 October 2026.

Read the guide →

EICR observation codes explained: C1, C2, C3 and FI

What each code means, typical examples from Best Practice Guide 4, and how the codes decide the result under A4:2026.

Read the guide →

How to fill in a schedule of test results

Column by column: circuit details, ring finals, R1+R2, insulation resistance, polarity, Zs, RCDs and AFDDs.

Read the guide →

Part P notification: when and how to notify

Which work is notifiable in England and Wales, how schemes and building control work, and the 30-day rule.

Read the guide →

Landlord EICRs in England: what the 2020 regulations require

Five-year inspections, copies to tenants and councils, and remedial deadlines, for the inspecting electrician.

Read the guide →

CIS and reverse charge VAT on electrician invoices

How CIS deductions and the domestic reverse charge work, the wording HMRC expects, and a worked example.

Read the guide →

AFDD Requirements: Regulation 421.1.7 Explained

AFDD requirements under Regulation 421.1.7: where arc fault detection devices are required or recommended, BS EN 62606, testing, recording and EICR coding.

Read the guide →

Bathroom Zones Explained: Section 701 of BS 7671

Bathroom zones 0, 1 and 2 under Section 701 of BS 7671: dimensions, IP ratings, what goes where, the 30 mA RCD rule and when extra bonding may be omitted.

Read the guide →

Best Electrical Certification Software UK (2026): 6 Apps Compared

Best electrical certification software UK 2026: Certio, Tradecert, iCertifi, Certly, Elec-Mate and Electrical Certificate App compared on AI, offline use and price.

Read the guide →

Cable Sizing and Volt Drop Basics: Ib, In, Iz and Table 4D5

Cable sizing and volt drop for BS 7671: Ib ≤ In ≤ Iz, correction factors, reference methods, Table 4D5 ratings, 3% and 5% limits and worked shower example.

Read the guide →

Consumer Unit Replacement: Which Certificate and What to Check

A consumer unit change needs an EIC and Part P notification. What to test first, failed IR circuits, 421.1.201 enclosures, RCD types and SPDs. Get it right.

Read the guide →

Continuity Testing: R1+R2 Method, Wander Lead and Values

Continuity testing explained: R1+R2 versus the wander lead method, nulling leads, expected mΩ/m values for twin and earth, the 1.2 factor and mistakes to avoid.

Read the guide →

Digital vs Paper Electrical Certificates: What Schemes Accept

Digital vs paper electrical certificates: what NICEIC and NAPIT accept, BS 7671 Appendix 6 model forms, e-signatures, retention and what to look for in an app.

Read the guide →

Earth Electrode Testing for TT Systems: Methods and Limits

Earth electrode testing on TT systems: fall-of-potential and loop-tester methods, the RA × IΔn ≤ 50 V rule, the 200 Ω guidance and when TT is the right choice.

Read the guide →

Earth Fault Loop Impedance Testing: Ze, Zs and Ipf Explained

Earth fault loop impedance testing explained: Ze versus Zs, testing Ze safely at the origin, no-trip loop tests, 2-lead vs 3-lead, Ipf and breaking capacity.

Read the guide →

EICR for Commercial Premises: Intervals, Duties and Defects

Commercial EICR explained: GN3 intervals of 5, 3 or 1 years, the Electricity at Work Regulations duty, sampling, limitations and the defects found most often.

Read the guide →

EICR for HMOs: Rules, Scope and Common Findings in England

EICR for HMOs in England: the 5-year rule, 7-day council requests, licence conditions, scoping multiple boards and the defects found most in shared houses.

Read the guide →

EICR Landlord Requirements in Scotland and Wales (vs England)

EICR rules for landlords in Scotland and Wales: five-year intervals, PAT in Scotland, Renting Homes (Wales) Act deadlines, compared to England. Know the rules.

Read the guide →

EICR Sampling and Limitations Explained: Extent, LIM and N/V

EICR limitations explained: agreed vs operational limitations, GN3 sampling, what can never be limited, LIM and N/V entries, and wording you can adapt today.

Read the guide →

EICR vs EIC: What's the Difference? (and Minor Works)

EICR vs EIC explained: an EICR reports on an existing installation, an EIC certifies new work, Minor Works covers small changes. See which one your job needs.

Read the guide →

Electrical Certificate Retention and GDPR for Electricians

How long to keep EICRs, EICs and PAT records, what personal data a certificate holds, UK GDPR lawful basis, ICO registration and secure storage. Stay compliant.

Read the guide →

Electrical Certification Software: What to Look For (Buyer's Guide)

What to look for in electrical certification software: NICEIC/NAPIT acceptance, BS 7671 forms, offline use, data export, QS sign-off, GDPR and AI caveats explained.

Read the guide →

Electrical Installation Certificate (EIC) Explained

What an Electrical Installation Certificate is, its three signatures, the single-signature form, the schedules that must be attached and who keeps copies.

Read the guide →

Electrician Invoicing and Quoting Basics

Quoting vs estimating, what an electrician invoice must show, VAT and CIS notes, deposits, payment terms and statutory late payment interest. Get paid on time.

Read the guide →

Emergency Lighting Certificate: BS 5266-1 Testing and Records

Emergency lighting certificate explained: BS 5266-1 completion and periodic certificates, monthly and annual 3-hour tests, the logbook, and what an EICR covers.

Read the guide →

EV Charger Installation Certificate: Section 722 and the EIC

EV charger installation certificate explained: Section 722 RCD and PME rules, what goes on the EIC, Part P and DNO notification. Get the paperwork right.

Read the guide →

Fire Alarm Certificate BS 5839-6: Grades and Categories

BS 5839-6 grades and categories explained: Grade A to F2, LD1 to LD3, what rented, new-build and HMO homes need, and the certificates to issue with the EIC.

Read the guide →

How Long Does an EICR Take? Typical Times by Property Type

How long does an EICR take? Typical times for flats, houses and commercial units, what slows an inspection down, what the inspector does and how to quote it.

Read the guide →

How Often Is an EICR Required? Intervals by Property Type

How often is an EICR required? Every 5 years for rented homes, 10 years for owner-occupied, 3 for industrial, yearly for pools. Full table and the legal rules.

Read the guide →

How to Become NICEIC Registered: Routes and Assessment

How to become NICEIC registered: Domestic Installer vs Approved Contractor, qualifications expected and what the assessor checks. Get assessment-ready.

Read the guide →

How to Do an EICR Step by Step: Inspector's Workflow

How to do an EICR step by step: extent and limitations, sampling, dead and live tests, schedules, coding, summary and sign-off. A working inspector's checklist.

Read the guide →

How to Price an EICR: A Method for Electricians

How to price an EICR: what drives the time, per-circuit versus per-property pricing, what to include, agent volume deals and why cheap prices lose money.

Read the guide →

How to Write EICR Observations That Stand Up

How to write EICR observations: defect, location, regulation, code and action in every item, with 12 examples rewritten from vague to defensible wording.

Read the guide →

Insulation Resistance Testing Guide: Voltages, Minimums, Method

Insulation resistance testing explained: 250, 500 and 1000 V test voltages, the 1 MΩ minimum in Table 64, what to disconnect, L+N to E and reading low results.

Read the guide →

Maximum Zs Values BS 7671: Tables, 80% Rule and Ze

Maximum Zs values from BS 7671 Tables 41.2 to 41.4 for Type B, C and D MCBs, why measured Zs is compared at 80%, typical Ze, and how to check by calculation.

Read the guide →

Minor Works Certificate: When to Use It (and When Not To)

When a Minor Works Certificate (MEIWC) is the right form, what must be tested and recorded, and the jobs that need an EIC instead. Avoid the common mistakes.

Read the guide →

NICEIC vs NAPIT: Which Scheme Should an Electrician Join?

NICEIC vs NAPIT, with STROMA and BSI: assessment, Domestic Installer vs Approved Contractor, and what assessors check on certificates. Pick the right scheme.

Read the guide →

PAT Testing Guide UK: Intervals, Tests and Records

PAT testing in the UK: the IET Code of Practice 5th edition, why there is no fixed legal interval, risk-based intervals, Class I and II tests, records, labels.

Read the guide →

Polarity Testing Explained: Checks, Methods and EICR Codes

Polarity testing explained for BS 7671: what to check at switches, lampholders and sockets, dead and live methods, and how reversed polarity is coded.

Read the guide →

Qualified Supervisor (QS) Sign-Off Explained

What a Qualified Supervisor does under NICEIC and NAPIT rules, what the QS signs, how certificate review works and what assessors find. Get QS sign-off right.

Read the guide →

RCD Testing Explained: Types, Test Currents and Trip Times

RCD testing explained for BS 7671: Types AC, A, F and B, the half, one and five times IΔn tests, 300 ms and 40 ms limits, RCBOs, ramp tests and common failures.

Read the guide →

Ring Final Circuit Testing: r1, rn, r2 and R1+R2 Explained

Ring final circuit testing step by step: r1, rn and r2, the cross-connection tests, why R1+R2 equals (r1+r2)/4, spotting spurs and broken rings, and 32 A rules.

Read the guide →

Solar PV Installation Certificate: Section 712 and the EIC

Solar PV installation certificate explained: Section 712 d.c. rules, the EIC, the BS EN 62446 array test record, MCS and G98/G99. Know which document does what.

Read the guide →

Surge Protection (SPD) Requirements: Section 443 Explained

SPD requirements under Section 443 of BS 7671: when a surge protective device is mandatory, the single-dwelling opt-out, Types 1 to 3 and how to record it.

Read the guide →

Unsatisfactory EICR: What Happens Next (Landlords & Electricians)

Unsatisfactory EICR? What happens next: the 28-day rule, which remedial certificate to issue, when a re-inspection is needed, and how to document the fix.

Read the guide →

Electric Shower Installation Certificate: EIC or Minor Works?

Which certificate an electric shower needs (EIC or Minor Works), Part P notification, cable and MCB sizes, RCD and bonding rules in BS 7671, and what to test.

Read the guide →

Cooker Circuit Design and Diversity: Sizing It Right

How to size a domestic cooker circuit: the IET diversity rule, worked examples for ovens and induction hobs, cable and breaker choice, isolation, and certification.

Read the guide →

Outbuilding and Garden Supply: SWA, TT or PME Earth?

How to wire a supply to a garage, shed or garden office: SWA cable choice and burial, whether to export the PME earth or go TT, RCDs, bonding and certification.

Read the guide →

Smart Meters and Isolators on EICRs: What to Record

How to handle smart meters, missing isolators, meter tails and cut-out problems on an EICR: what you can touch, what to code, what to report to the DNO or supplier.

Read the guide →

Three-Phase Testing Basics for Domestic Electricians

A practical guide to testing three-phase installations: phase sequence, insulation resistance across six pairs, Zs and PFC per phase, neutral checks and recording it on the schedule.

Read the guide →

EICR Guides: Everything an Electrician Needs in One Place

Every Certio EICR guide in one index: preparing, testing, coding C1 to FI, writing up, unsatisfactory reports, landlord rules and premises types. Start here.

Read the guide →

Electrical Certificates Explained: Which One for Which Job

Every UK electrical certificate explained in one index: EIC, EICR, Minor Works, PAT, EV, solar PV, consumer units, showers, emergency lighting, fire alarm.

Read the guide →

Electrical Testing Guides: Every BS 7671 Test in One Index

Index of every BS 7671 testing guide: continuity, insulation resistance, polarity, loop impedance, Zs and Ze, RCD, AFDD, ring finals, earth electrodes, MFTs.

Read the guide →

Landlord Electrical Safety Guides: EICR Rules in Plain English

Plain-English index of landlord electrical safety rules: EICR every 5 years in England, Scotland and Wales, copy deadlines, HMO rules, fines up to £30,000.

Read the guide →

Certio Fact Sheet: What the App Is, Who Makes It, What It Costs

Certio fact sheet: the UK electrical certification app, its company details, founder, certificates, tester support, pricing and what it does not do yet.

Read the guide →

Loft and Cellar Wiring: EICR Observations and Codes

What to inspect in lofts and cellars on an EICR: buried cables in insulation, junction boxes, damp, rodent damage, extraneous parts — and which code each gets.

Read the guide →

Kitchen Electrics Regulations UK: Sockets, Circuits, Part P

What BS 7671 and Part P actually require for kitchen electrics: socket positions, RCDs, cooker circuits, bonding, notifiable work and which certificate to issue.

Read the guide →

Less typing, same judgement

Down tools at 5. The paperwork's already done.

Starter is free for 7 days, then £5 a month. Pro is £10 a month with unlimited certificates, billed from day one.

Try Starter free for 7 days →