Guide

Electrical Installation Certificate (EIC) Explained, Section by Section

The Electrical Installation Certificate explained section by section: the three declarations, supply details, schedules, Section I and the Amendment 4 form.

Published 14 September 2026 · Updated 8 October 2026 · Certio Software Ltd

An Electrical Installation Certificate (EIC) is the BS 7671 certificate for new work: a new installation, an addition or alteration that introduces a new circuit, or a replacement consumer unit or distribution board. The Amendment 4 model form, dated 15 April 2026, runs from Section A to Section J and carries three declarations in Section C: design, construction, and inspection and testing. Its own notes say it is only valid if the schedule of inspections has been completed and the schedules of circuit details and test results are attached. This guide goes through the form section by section, in the order you fill it in on a job.

Key takeaways
  • An EIC certifies new work under Chapter 64 of BS 7671 (initial verification). It is not a condition report and it does not expire.
  • The model form has ten sections, A to J. The three declarations sit in Section C, and each signatory's liability is limited to the work described on the certificate.
  • One electrician who designed, installed and tested the job signs in all three places. The IET publishes no separate short form; single-signature versions come from scheme providers.
  • Sections F and G are measured, not copied: Ze, prospective fault current (the greater of the short-circuit and earth fault values), earthing arrangement, maximum demand, earthing and bonding conductor sizes.
  • Section I, comments on the existing installation, is a requirement of Regulation 644.1.2 on every addition or alteration.
  • The designer must insert the interval to the first periodic inspection in Section D.
  • Amendment 2 is withdrawn on 15 October 2026. The declaration says "amended to" a date you write in, so the form records which edition the job was designed to.

What is an Electrical Installation Certificate and when is one required?

Regulation 641.1 of BS 7671 requires every installation to be inspected and tested during erection and on completion, before it is put into service. Regulation 644.1 then requires an EIC, based on the model in Appendix 6, to be provided once that verification is complete. The EIC is the written record that the work was verified and found to comply.

The notes printed with the Amendment 4 model form give its uses: the initial certification of a new installation, an addition or alteration where one or more new circuits have been introduced, and the replacement of a consumer unit or distribution board. It can also cover several small additions or alterations on one certificate in place of a stack of Minor Works certificates. The same notes say it is not to be used for periodic inspection and testing, which needs an EICR.

Work Certificate
New build, extension or rewire with new circuits EIC
New circuit of any length: cooker, shower, EV charger, PV, outbuilding EIC
Consumer unit or distribution board replacement EIC
Socket or lighting point added to an existing circuit Minor Works (MEIWC), or an EIC
Accessory or luminaire replaced MEIWC, or an EIC
Periodic inspection of an existing installation EICR

An EIC is always acceptable for small work. A Minor Works certificate for a new circuit never is. For the boundary cases see EICR vs EIC vs Minor Works and Minor Works certificate: when to use it. The one-paragraph version for customers is in what an EIC is.

What is in each section of the Amendment 4 model EIC?

The IET's Amendment 4 model form is lettered A to J. Scheme pads and software lay it out differently, but the content should map onto the same ten sections.

Section Title on the model form What you record
A Details of the client The person or organisation that ordered the work
B Installation details Installation address, description of the installation, whether the work is new, an addition or an alteration, and the extent covered by the certificate
C Certification signatories The declarations for design (with space for two designers), construction, and inspection and testing, each with any departures
D Next inspection The designer's recommended maximum interval to the first periodic inspection
E Particulars of signatories in Section C Name, company and address for each designer, the constructor and the inspector
F Supply characteristics and earthing arrangements Earthing arrangement, number and type of live conductors, AC or DC, U and U0, frequency, Ipf, Ze, supply protective device
G Particulars of installation referred to in the certificate Means of earthing, maximum demand, earth electrode, earthing conductor, main protective bonding, main switch
H Schedule of inspections Items 1.0 to 14.0, each given an outcome or marked N/A
I Comments on existing installation Defects found in the existing installation, for an addition or alteration (Regulation 644.1.2)
J Schedules The schedules of circuit details and test results attached, one set per distribution board

Section B deserves more care than it usually gets. The extent is what your signature covers, and every declaration ends by limiting your liability to the work described. "Rewire" tells nobody anything. "Full rewire of ground and first floor, 10 final circuits from new consumer unit in under-stairs cupboard; garage sub-main existing and not altered" tells the next inspector exactly where your work stops.

Who signs the design, construction, and inspection and testing declarations?

BS 7671 does not license anyone to sign. Part 6 requires certificates to be compiled and signed, or otherwise authenticated, by skilled persons competent to verify that the requirements have been met. The form then splits the responsibility three ways. Each signatory certifies, having exercised reasonable skill and care, that the work they were responsible for is to the best of their knowledge and belief in accordance with BS 7671:2018, amended to a date they write in, except for any departures listed.

Declaration What the signature covers In practice
Design The design complies Earthing arrangement and protective measures; maximum demand and diversity; cable sizing so that Ib ≤ In ≤ Iz with volt drop inside 3% for lighting and 5% for other uses; device type, rating and breaking capacity; RCD type; SPD and AFDD decisions; the maximum Zs each circuit must meet
Construction The installation was built to the design and to BS 7671 Selection and erection to Part 5; cables in prescribed zones (522.6.202); supports that will not collapse early in a fire (521.10.202); sound terminations (Section 526); earthing and bonding to Chapter 54
Inspection and testing The work was inspected and tested to Chapter 64 and the results are on the schedules Inspection before testing (Section 642), the test sequence in Section 643, and the schedules in Sections H and J

On most domestic and small commercial jobs one electrician does all three. The notes on the form deal with that directly: a signatory authorised to certify more than one category of work signs in each of the appropriate places. The IET's model forms page lists one EIC for each edition and no separate short form, although the notes acknowledge that a single-signature EIC may be used. In practice those come from scheme providers, whose domestic certificates fold the three declarations into one. They ask for the same information and the same schedules.

Three points catch people out on jobs with more than one party.

Design is yours more often than you think. If nobody handed you cable calculations and a device schedule, you chose the cable and the breaker, so you are the designer. Cable sizing and volt drop covers what that signature takes on.

Do not sign for a design you did not do. Where a consultant or a kitchen company's designer specified the circuits, they sign the design declaration. The form has a Designer No 1 and a Designer No 2 for mutual responsibility, such as a consultant's distribution design and a contractor's final-circuit design.

The inspector needs the design information. Regulation 641.2 requires the assessment of general characteristics and the diagrams, charts and schedules to be made available to whoever inspects and tests. An inspector who has no maximum Zs figures or design currents to verify against is only measuring. Where the inspector works for a larger firm, Qualified Supervisor sign-off explains who authorises what.

The form also has boxes for departures (Regulations 120.3, 133.1.2, 133.1.3 and 133.5) and for permitted exceptions under Regulation 411.3.3, with a tick to confirm the risk assessment is attached. A departure is a deliberate design decision that gives a degree of safety not less than compliance would. It is not somewhere to park a defect. The 411.3.3 exception, leaving 30 mA RCD protection off a socket-outlet on the strength of a documented risk assessment, is not available in a dwelling.

How do you fill in the supply characteristics and installation particulars?

Sections F and G describe the origin. Every figure in them should be something you measured or inspected on this job, because every circuit calculation rests on them.

Entry What to record Check
Earthing arrangement TN-C, TN-S, TN-C-S (PME), TN-C-S (PNB), TT or IT Amendment 4 lists PME and PNB separately. See earthing arrangements explained
Live conductors 1-phase 2-wire, 2-phase 3-wire, 3-phase 3-wire or 3-phase 4-wire Three-phase work: three-phase testing basics
Nominal voltage and frequency U and U0, 50 Hz 400/230 V three-phase, 230 V single-phase
External loop impedance Ze Measured with the earthing conductor disconnected and the installation isolated Distributors' typical maximums are 0.8 Ω for TN-S and 0.35 Ω for PME. See what Ze is
Prospective fault current Ipf The greater of the short-circuit and earth fault values, as the form's notes require Must not exceed the breaking capacity of the devices. See what PFC is
Supply protective device BS (EN) number, type and rated current of the cut-out fuse Usually 60, 80 or 100 A to BS 88-3 or BS 1361. Do not guess a sealed fuse; record what the carrier is marked
Maximum demand Amps or kVA after diversity Compare with the cut-out fuse and tails
Means of earthing Distributor's facility or installation earth electrode For an electrode: type, location and measured resistance. See earth electrode testing
Earthing conductor and main bonding Material, cross-sectional area, continuity verified, and what each bond goes to: water, gas, oil, structural steel, lightning protection, other 16 mm² earthing conductor and 10 mm² bonding are the usual PME domestic sizes. See main protective bonding
Main switch Location, BS (EN), number of poles, current and voltage rating Where it is an RCD: IΔn, time delay and measured operating time

Two habits are worth keeping. First, measure Ze and Ipf even when the previous certificate is on the table. Supplies get altered, and a copied 0.35 Ω is the first thing an assessor spots. Second, a TT electrode reading above 200 Ω may not be stable, as the note to Table 41.5 warns, so say so in the remarks and improve it if you can.

What goes in the schedule of inspections?

Section H is the record of the inspection that Regulation 642.1 says must precede testing, normally with the installation disconnected. On the model EIC it runs to 14 items.

Item Heading
1.0 Condition of consumer's intake equipment (visual inspection only)
2.0 Parallel or switched alternative sources of supply
3.0 Protective measure: automatic disconnection of supply (ADS)
4.0 Basic protection
5.0 Protective measures other than ADS
6.0 Additional protection
7.0 Distribution equipment
8.0 Circuits (distribution and final)
9.0 Isolation and switching
10.0 Current-using equipment (permanently connected)
11.0 Identification and notices
12.0 Location(s) containing a bath or shower
13.0 Other special installations or locations
14.0 Prosumer's low voltage electrical installation(s)

Each item gets an outcome or N/A. There is no column for C1, C2 or C3, because the EIC is not a condition report: a defect found in new work is put right before the certificate is issued. Mark N/A honestly. A new shower circuit in a house with no PV has nothing to say under item 14.0, but it does have something to say under item 12.0, and bathroom zones under Section 701 covers what to look at.

What must the schedules of circuit details and test results show?

The model schedules number their columns 1 to 31: columns 1 to 16 are circuit details and 17 to 31 are test results. The header of each sheet identifies the distribution board and asks for Zdb, Ipf at the board, confirmation of supply polarity and phase sequence, and confirmation that any SPD shows as operational. It also asks for the serial or asset numbers of the instruments used.

Group Columns Notes
Circuit details Circuit number and description, type of wiring, reference method, number of points, live and cpc size The reference method drives Iz, so it is a design entry, not a formality
Overcurrent device BS (EN), type, rating, breaking capacity, maximum permitted Zs A B32 to BS EN 60898 is 1.37 Ω tabulated, 1.10 Ω after the 0.8 correction for testing at ambient temperature
RCD BS (EN), type, IΔn, rating Type A is the practical minimum for modern loads
Continuity r1, rn, r2 for rings; R1+R2 or R2 R1+R2 method and ring final testing
Insulation resistance Test voltage, live to live, live to earth Minimum 1 MΩ at 500 V d.c. for circuits up to 500 V (Table 64). See insulation resistance testing
Polarity Confirmed Polarity testing
Earth fault loop impedance Maximum measured Zs Compare with column 12. See loop impedance testing and maximum Zs values
RCD and AFDD Disconnection time in ms, RCD test button, AFDD manual test button A 30 mA non-delay RCD must trip within 300 ms at IΔn. The form notes that not all AFDDs have a test button

Test in the Section 643 order: continuity of conductors (643.2), insulation resistance (643.3), polarity (643.6), automatic disconnection of supply (643.7), additional protection (643.8), phase sequence (643.9), functional testing (643.10) and, where needed, verification of volt drop (643.11). Dead tests come first for a reason: an energised circuit with no cpc continuity is how people get hurt during commissioning.

Every circuit covered by the certificate gets a row, and every row is complete. On a board change that means every circuit you reconnected, not only the ones you touched. How to fill in a schedule of test results goes through the columns one at a time.

What do you write under comments on the existing installation?

Section I applies whenever the work is an addition or alteration. Regulation 644.1.2 requires defects found in the existing installation to be recorded on the certificate, and Regulation 132.16 requires you to confirm, before you start, that the existing equipment, earthing and bonding are adequate for the altered circumstances.

That splits what you find into two groups. Anything your work depends on is put right before you certify: missing main bonding to the gas, an undersized earthing conductor, a Ze too high for the disconnection times. Anything unrelated is written in Section I and reported to the customer: no RCD protection on circuits you did not touch, a lighting circuit with no cpc, a cracked accessory in another room. Useful entries are specific, for example "Upstairs lighting circuit has no cpc; Class II fittings only; advise rewire". If you found nothing, write "none observed". A blank box reads as though nobody looked.

What interval do you recommend for the first periodic inspection?

Section D reads: "I/We, the designer(s), recommend that this installation is further inspected and tested after an interval of not more than ... years/months." The notes say the interval must be inserted, that it should take account of the frequency and quality of maintenance the installation can expect, and that it should be agreed between the designer, the installer and other relevant parties.

IET Guidance Note 3 gives the recommended maximums most designers start from.

Installation Recommended maximum initial interval (GN3)
Owner-occupied dwelling 10 years, or at change of occupancy
Rented dwelling 5 years, or at change of occupancy
Commercial premises, offices, shops 5 years
Industrial premises 3 years
Swimming pools, caravan parks, marinas 1 year
Construction site installations 3 months

These are maximums. A workshop full of dust, or a rented house with a history of DIY alterations, can justify less. For a new-build or completely rewired rental in England, the GOV.UK guidance accepts the EIC in place of an EICR for five years from its date. How often an EICR is required has the full list.

How does the EIC change with the type of job?

Job Description and extent Schedules Watch for
New build or full rewire New installation, whole premises Full schedule of inspections; every circuit on the test results Maximum demand; SPD and AFDD decisions recorded; first interval
One new circuit (shower, cooker, EV, PV) Addition; name the circuit and what it supplies Relevant inspection items; one row on the test results Section I; suitability of the existing earthing, bonding and main switch (132.16)
Consumer unit replacement Alteration; "replacement of consumer unit, existing circuits reconnected and tested" Every reconnected circuit Pre-work survey, circuits left disconnected, Section I
Several small alterations on one visit Alteration; list each circuit A row per circuit altered Saves issuing a Minor Works certificate for each circuit

Job-specific detail is in the guides for consumer unit replacement, electric showers, EV chargers under Section 722 and solar PV under Section 712.

Who gets the EIC and how long do you keep your copy?

The original goes to the person who ordered the work and you keep a duplicate. The guidance for recipients printed with the form adds four things worth telling the customer:

  • If they ordered the work but do not own the installation, they should pass the certificate, or a full copy including the schedules, to the owner immediately.
  • The original should be kept in a safe place and shown to anyone who later inspects or works on the installation.
  • On a project covered by the Construction (Design and Management) Regulations, a copy with its schedules goes into the health and safety documentation.
  • RCDs, and AFDDs that have a manual test facility, should be tested six-monthly with the test button, and SPD status indicators should be checked.

In England and Wales the EIC is not the Building Regulations certificate. For notifiable work in a dwelling, a registered electrician notifies through the scheme within 30 days of completion and the customer receives a separate compliance certificate. Part P notification covers what is notifiable.

For your own copy, six years is the minimum NICEIC's scheme rules set, and 15 years is the safer figure for work in dwellings completed after 28 June 2022, because that is how long a Defective Premises Act claim can now run. Certificate retention and GDPR sets out the reasoning. A lost EIC can only be replaced from the issuer's duplicate. Nobody else can reissue it, and an EICR by another electrician reports the condition today without certifying the original work.

What did Amendment 4 change, and which edition goes in the declaration?

BS 7671:2018+A4:2026 was published on 15 April 2026 and the IET's model forms carry that date. The purpose and structure of the EIC are unchanged. Two details matter when you fill it in: the earthing arrangement options now list TN-C-S (PME) and TN-C-S (PNB) separately, where the Amendment 2 form had a single TN-C-S box, and the form set now includes a generic schedule for supplementary protective equipotential bonding inspection and test results.

Amendment 2, as amended by Amendment 3, is withdrawn on 15 October 2026. Each declaration certifies compliance with BS 7671:2018 "amended to" a date you write in, so the form records which edition the job was designed to. NICEIC's Amendment 4 guidance is that newly designed work from that date is certified to Amendment 4, and that work designed earlier may be completed to the previous standard even if it finishes afterwards. Match the declaration to the design, and check which edition your pads or software cite. Digital vs paper certificates covers the changeover.

The model forms can be downloaded free from the IET. Its terms allow you to copy and electronically adapt them for use in your own electrical contracting business, but not to resell blank forms or to reproduce the IET logo on your copies.

What are the common EIC mistakes?

Mistake Why it matters Fix
Schedules missing or incomplete The form says it is only valid with them Complete Section H and attach every schedule, with page numbers and the total
Ze and Ipf copied from an old certificate Every Zs and breaking-capacity check rests on them Measure at the origin on every job
Ipf recorded as the earth fault value only The notes ask for the greater of the two Measure line to neutral and line to earth, record the higher
Vague description and extent Your liability is limited to the work described Name the circuits, the board and what was not altered
Section I left blank on an alteration Regulation 644.1.2 requires existing defects to be recorded List them, or write "none observed"
No first-inspection interval The notes say it must be inserted Use the GN3 maximum unless conditions justify less
Signing the design declaration for someone else's design You take on responsibility for calculations you never saw Get the designer's signature
Maximum Zs column left empty, or filled without stating the basis Nobody can tell whether the measured Zs passes Enter the figure for the device fitted and say whether it is the tabulated or the corrected value
A departure used to excuse a defect A departure must give no less safety than compliance Fix the defect; record only deliberate design departures
Wrong amendment date in the declaration The certificate claims an edition the design did not follow Write the amendment the job was designed to

Scheme assessors sample issued certificates, and incomplete schedules are among the first things they check. How to become NICEIC registered describes what is looked at on the day.

How Certio helps

Certio produces the EICR, EIC, Minor Works certificate and PAT records on the BS 7671 model forms and turns them into branded PDFs. Photograph the consumer unit and the circuit schedule drafts itself; point the phone camera at a Megger MFT-X1 and the reading goes straight into the schedule of test results, or dictate it while your hands stay on the probes. Suggested observation wording with the regulation reference is there for you to check and confirm. The judgement stays yours; the typing goes. Starter is free for 7 days, then £4.99 a month.

Straight answers

Questions

What is an Electrical Installation Certificate (EIC)?
An Electrical Installation Certificate is the BS 7671 certificate for new electrical work: a new installation, an addition or alteration that introduces a new circuit, or a replacement consumer unit or distribution board. It carries separate declarations for design, construction, and inspection and testing, and it is only valid with its completed schedule of inspections and schedules of circuit details and test results.
Who can sign an Electrical Installation Certificate?
BS 7671 requires the certificate to be compiled and signed, or otherwise authenticated, by skilled persons competent to verify that its requirements have been met. Each declaration is signed by whoever was responsible for that part of the work. One electrician who designed, installed and tested the job signs all three, which is the normal position on domestic work.
Is an EIC valid without a schedule of test results?
No. The notes on the Amendment 4 model form say the certificate is only valid if the schedule of inspections has been completed and the schedules of circuit details and test results are attached. Page numbers and the total number of pages should be shown on each sheet, so that a missing schedule is obvious to whoever reads it later.
Can I use a Minor Works certificate instead of an EIC for a new circuit?
No. A Minor Electrical Installation Works Certificate is for an addition or alteration that does not extend to a new circuit, and it cannot be used for a replacement consumer unit or distribution board. A new circuit of any length needs an EIC. The reverse is allowed: an EIC can always be issued for small work.
How long is an EIC valid for?
An EIC does not expire. It certifies that the work complied with BS 7671 on the date it was signed. What it carries is the designer's recommended maximum interval to the first periodic inspection, commonly ten years for an owner-occupied home and five years for rented or commercial premises under IET Guidance Note 3. After that an EICR takes over.
Who keeps the original EIC?
The original goes to the person who ordered the work, and the contractor keeps a duplicate. If the person who ordered the work does not own the installation, the form's guidance says they should pass the certificate, or a full copy including the schedules, to the owner immediately. On a CDM project a copy goes into the health and safety documentation.
What happens if an EIC is lost?
Ask the contractor who issued it for a copy of their duplicate, which is why you keep yours. Nobody else can reissue it, because the declarations are personal to the people responsible for the work. If the contractor cannot be found, the only option is an EICR, which reports the installation's condition today and does not certify the original work.
Which edition of BS 7671 goes on an EIC after 15 October 2026?
The declaration reads BS 7671:2018 'amended to' a date that you write in, so enter the amendment the work was designed to. Amendment 2 is withdrawn on 15 October 2026 and newly designed work from then is certified to Amendment 4. NICEIC's guidance is that work designed before that date may still be completed to the previous standard.
Less typing, same judgement

Down tools at 5. The paperwork's already done.

Certio lays out EICR, EIC, Minor Works and PAT certificates to the BS 7671 model forms and produces branded PDFs. Photograph the board and the schedule drafts itself; point the camera at a Megger MFT-X1 and the reading goes straight in. There's a free plan with no card, and the paid plans are free for 7 days. Then Starter is £4.99 a month and Pro £9.99 with unlimited certificates.

Try Starter free for 7 days →

More on EICR software and AI EICR software.