Guide

Electrical Certificates Explained: Which One for Which Job

Every UK electrical certificate explained in one index: EIC, EICR, Minor Works, PAT, EV, solar PV, consumer units, showers, emergency lighting, fire alarm.

Published 16 September 2026 · Updated 16 September 2026 · Certio Software Ltd

UK electrical certificates fall into three groups. BS 7671:2018 Appendix 6 defines the Electrical Installation Certificate (EIC) for new installations and new circuits, the Minor Electrical Installation Works Certificate for additions or alterations to a single existing circuit, and the Electrical Installation Condition Report (EICR) for periodic inspection of an existing installation. Separate standards cover the rest: the IET Code of Practice for In-service Inspection and Testing for PAT records, BS 5266 for emergency lighting and BS 5839-6 for domestic fire alarms. In England and Wales, notifiable work under Part P also produces a Building Regulations compliance certificate. This page indexes every certificate guide on Certio and tells you which document applies to which job.

Key takeaways
  • New circuit or new installation: EIC. Alteration to an existing circuit: Minor Works. Assessment of an existing installation: EICR.
  • Consumer unit changes, EV chargers, solar PV and most electric showers need an EIC, and in England and Wales are usually notifiable under Part P.
  • Emergency lighting, fire alarms and PAT have their own certificates under BS 5266, BS 5839-6 and the IET Code of Practice.
  • A certificate is only complete when it is signed by the responsible persons; in a scheme-registered firm the Qualified Supervisor signs off.
  • Digital PDFs are valid; retention and UK GDPR rules apply to whatever format you use.

Which certificate for which job?

Job Certificate Notifiable under Part P (England and Wales)? Guide
New installation or rewire EIC Yes Electrical Installation Certificate (EIC) Explained
New circuit from an existing board EIC Yes What is an EIC? Electrical Installation Certificate
Consumer unit replacement EIC Yes Consumer Unit Replacement: Which Certificate and What to Check
Extra socket on an existing ring Minor Works No, unless in a special location Minor Works Certificate: When to Use It (and When Not To)
Like-for-like accessory replacement Minor Works No What is a Minor Works Certificate? MEIWC explained
Periodic inspection of existing wiring EICR Not applicable What is an EICR? Electrical Installation Condition Report
Electric shower on a new circuit EIC Yes Electric Shower Installation Certificate: EIC or Minor Works?
EV charge point EIC (Section 722) Yes EV Charger Installation Certificate: Section 722 and the EIC
Solar PV system EIC (Section 712) plus MCS documentation Yes Solar PV Installation Certificate: Section 712 and the EIC
Outbuilding or garden supply EIC Yes Outbuilding and Garden Supply: SWA, TT or PME Earth?
Portable appliance testing PAT test record Not applicable PAT Testing Guide UK: Intervals, Tests and Records
Emergency lighting BS 5266 completion or periodic certificate Not under Part P Emergency Lighting Certificate: BS 5266-1 Testing and Records
Domestic fire alarm BS 5839-6 certificate Not under Part P (Part B applies) Fire Alarm Certificate BS 5839-6: Grades and Categories

What is the difference between an EIC, a Minor Works certificate and an EICR?

An EIC (Electrical Installation Certificate) is issued for a new installation, an addition that includes a new circuit, or the replacement of a consumer unit. It carries a full schedule of inspections and a schedule of test results for every circuit and is signed for design, construction, and inspection and testing, which may be one person or three. What is an EIC? Electrical Installation Certificate gives the definition and Electrical Installation Certificate (EIC) Explained walks through each section.

A Minor Electrical Installation Works Certificate is the short form for additions and alterations that do not include a new circuit: an extra socket on an existing ring, a replacement light fitting, a moved switch. What is a Minor Works Certificate? MEIWC explained explains the form and Minor Works Certificate: When to Use It (and When Not To) draws the line between Minor Works and EIC with worked examples, including the common mistake of using Minor Works for a new shower circuit.

An EICR (Electrical Installation Condition Report) is not a certificate at all. It is a report on the condition of an existing installation, with observations coded C1, C2, C3 or FI and an overall Satisfactory or Unsatisfactory result. What is an EICR? Electrical Installation Condition Report and EICR vs EIC: What's the Difference? (and Minor Works) explain the distinction, and the full EICR process is at How to Do an EICR Step by Step: Inspector's Workflow.

Which certificate do specific jobs need?

Several common jobs cause confusion, usually because the work feels small but involves a new circuit.

What about PAT, emergency lighting and fire alarms?

These are outside BS 7671 Appendix 6 and use their own documents. PAT (portable appliance testing, formally in-service inspection and testing of electrical equipment) follows the IET Code of Practice, 5th edition 2020, which sets no fixed legal interval and asks the duty holder to decide frequency by risk. PAT Testing Guide UK: Intervals, Tests and Records explains the tests, the record to keep and how to set intervals.

Emergency lighting is certified under BS 5266-1 with a completion certificate for new systems and periodic certificates for the monthly and annual tests; Emergency Lighting Certificate: BS 5266-1 Testing and Records sets out what each covers. Domestic fire detection is certified under BS 5839-6, which defines Grades (the type of system, from Grade A panel systems to Grade F battery alarms) and Categories (the coverage, LD1 to LD3); Fire Alarm Certificate BS 5839-6: Grades and Categories explains how to specify and certify a system, including the Grade D1 requirement common in rentals.

What is Part P and when does the work need notifying?

Part P of the Building Regulations applies in England and Wales and requires notifiable electrical work in dwellings to be notified to building control, either directly or through a competent person scheme such as NICEIC or NAPIT. Notifiable work includes new circuits, consumer unit replacements and work in special locations such as bathrooms. Part P notification: when and how electricians notify building work explains what is notifiable, the 30-day notification window and the Building Regulations compliance certificate the customer receives. How to Become NICEIC Registered: Routes and Assessment and NICEIC vs NAPIT: Which Scheme Should an Electrician Join? cover joining a scheme, and Qualified Supervisor (QS) Sign-Off Explained explains who signs certificates in a registered firm and what the QS is responsible for.

Digital or paper, and how long do I keep them?

BS 7671 requires certificates to contain the information in the model forms and to be signed; it does not require paper. Digital vs Paper Electrical Certificates: What Schemes Accept compares the two, including how assessors treat PDFs and what a digital signature needs to show. Retention is covered in Electrical Certificate Retention and GDPR for Electricians: keep certificates at least until the next inspection and, for most firms, for 6 years or more, and handle the customer and tenant details on them in line with the UK GDPR. If you are choosing software to produce them, Electrical Certification Software: What to Look For (Buyer's Guide) and Best Electrical Certification Software UK (2026): 6 Apps Compared set out what to compare.

How Certio helps

Certio produces the EICR, EIC, Minor Works certificate and PAT records on the BS 7671 model forms and turns them into branded PDFs. Photograph the consumer unit and the circuit schedule drafts itself; point the phone camera at a Megger MFT-X1 and the reading goes straight into the schedule of test results, or dictate it while your hands stay on the probes. Suggested observation wording with the regulation reference is there for you to check and confirm. The judgement stays yours; the typing goes. Starter is free for 7 days, then £5 a month.

Straight answers

Questions

What are the three main electrical certificates in the UK?
BS 7671 Appendix 6 defines three: the Electrical Installation Certificate (EIC) for new installations and new circuits, the Minor Electrical Installation Works Certificate for additions or alterations to an existing circuit, and the Electrical Installation Condition Report (EICR) for periodic inspection of an existing installation. PAT records, fire alarm and emergency lighting certificates sit under separate standards.
Which certificate do I need for a new consumer unit?
An Electrical Installation Certificate (EIC). A consumer unit replacement is a new installation of the distribution equipment and is notifiable under Part P in England and Wales, so it also needs a Building Regulations compliance certificate through a competent person scheme or a building control application. A Minor Works certificate is not acceptable for this job.
Can I use a Minor Works certificate for a new circuit?
No. A Minor Electrical Installation Works Certificate is only for additions and alterations that do not include a new circuit, such as adding a socket to an existing ring or replacing a light fitting. A new circuit, including a new way in the consumer unit, requires an EIC with a full schedule of test results.
Is an EV charger installation notifiable under Part P?
Usually yes. In England installing an EV charging point normally involves a new circuit from the consumer unit, which is notifiable work under Part P of the Building Regulations. It is certified on an EIC under BS 7671 Section 722, and the notification is made through a competent person scheme or building control within 30 days of completion.
How long should electrical certificates be kept?
There is no single statutory retention period for electricians, but the practical minimum is until the next inspection, and many insurers and schemes expect 6 years or more. Landlords in England must keep an EICR until the next one is issued and supply copies to tenants and the council on request. Store certificates so they can be found and shared quickly.
Are digital electrical certificates legally valid?
Yes. BS 7671 requires the certificate to contain the information on the model forms and to be signed by the persons responsible; it does not require paper. A PDF with a typed or drawn signature is accepted by NICEIC, NAPIT, local authorities and landlords. Keep a copy that cannot be altered after issue.
Less typing, same judgement

Down tools at 5. The paperwork's already done.

Certio lays out EICR, EIC, Minor Works and PAT certificates to the BS 7671 model forms and produces branded PDFs. Photograph the board and the schedule drafts itself; point the camera at a Megger MFT-X1 and the reading goes straight in. Starter is free for 7 days, then £5 a month. Pro is £10 a month with unlimited certificates.

Try Starter free for 7 days →

More on EICR software and AI EICR software. Prices exclude VAT.